Wednesday, January 18, 2012

Floors and doors

Here's a shot of what the exterior of the house looks like these days. The snow mostly melted so you can see the stairs and deck. The front door is on. It's made for giants at 8' tall, but it looks proportional to the rest of the front of the house. The stained glass adds a nice detail and the two panels match the interior doors.

The outdoor lights are all up.
 


The slate is down in the powder room and the plumbing is all ready to go for the vanity and stone vessel sink.


The closet rods are all up and ready for the next round of painting.


The jack and jill bath surround is grouted as well. Still need one more sheet of accent tiles to finish up!

Dale grouted the floors in the master and the glass tiles in the master shower. The back splash is almost done. You can see the progress from today...just a little more to grout. The plumber started to install the fixtures in the shower...looks complicated!






The cabinet guys were back to finish up the last little details like the shelf and rod for above the dryer and the laundry room counter top.
 

They are also working on hanging the microwave and building the face frame around it so that it looks like a built in microwave. The range hood is in progress as well. 
 


The plumber installed the faucets in the kitchen. No drains or water, yet, but they look great! 
  

The plywood stair treads are on...so now it's up to us to put the hardwood on top.

 Kip and Marcus finished trimming the collar ties with doug fir...now they just need to be stained.