The outdoor lights are all up.
The slate is down in the powder room and the plumbing is all ready to go for the vanity and stone vessel sink.
The closet rods are all up and ready for the next round of painting.
The jack and jill bath surround is grouted as well. Still need one more sheet of accent tiles to finish up!
Dale grouted the floors in the master and the glass tiles in the master shower. The back splash is almost done. You can see the progress from today...just a little more to grout. The plumber started to install the fixtures in the shower...looks complicated!
The cabinet guys were back to finish up the last little details like the shelf and rod for above the dryer and the laundry room counter top.
They are also working on hanging the microwave and building the face frame around it so that it looks like a built in microwave. The range hood is in progress as well.
The plumber installed the faucets in the kitchen. No drains or water, yet, but they look great!
The plywood stair treads are on...so now it's up to us to put the hardwood on top.
Kip and Marcus finished trimming the collar ties with doug fir...now they just need to be stained.
Great detail work all around!